Rates for CIGRE 2025

  Early bird Rate Regular Rate Late Registration
  Until July 16 July 17 - August 30 From August 31
CIGRE member CAN$ 1,210.00 CAN$ 1,460.00 CAN$ 1,860.00
CIGRE non-member CAN$ 1,550.00 CAN$ 1,850.00 CAN$ 2,250.00
Young engineer (under 35) CAN$ 900.00 CAN$ 1,000.00 CAN$ 1,400.00
Student CAN$ 325.00 CAN$ 325.00 CAN$ 325.00

No refund. No name change. Tax excluded. Please note that meeting room capacity is limited. Registrations after July 17 are not guaranteed.


Please complete

VISA - Application for an invitation letter

Registration

Access to:
  • Keynotes, Panels, Panel Luncheons
  • Paper Presentations
  • Tutorials
  • Networking 
  • Exhibition Area
  • Welcome Cocktail, Cocktail Reception and Banquet Dinner
  • Breakfasts, Luncheons, Coffee Breaks
** ADDITIONAL CHARGES for WORKSHOPS and TECHNICAL TOURS 

I Would Like to Attend the Following Events:


I Would Like to Attend One Technical Tour

Friday, October 3

Additional Charge CAN$ 75.00, Limited Availability
Built in 1929, Beauharnois generating station is the fifth most powerful and the longest run of river generating station in Québec with its 36 generating units. The tour will explain its history and how in generates more than 1,900 megawatts.
The tour includes:
  • Visit of the information center: Construction stages of the power station, hydraulic power of the river, the channel and management of water, hydroelectric production and electricity transmission
  • Visit of the generating station: Roof (view of the water intake), machine room, turbine pit
  • The tour also includes a quick stop close to Chateauguay substation 765 kV an its HVDC converter
Watch Discover IREQ
The tour of Hydro-Québec’s research institute will allow you to visit the biggest electricity research centre in North America. You will see many laboratories that work on hydroelectric powerplants optimization, an effective simulation of a power grid, the production of many different maintenance robots, research in battery materials and power transformer approval.
The tour includes:
  • Simulation laboratory: IREQ’s calculation centre and power grid simulation software, Hypersim. The laboratory is mainly used to optimize the production and the transmission of energy.
  • Experimentation laboratory: Laboratory that produces Hydro-Quebec’s small fleet of robots that helps for inspection and maintenance of the power grid as well as hydroelectric structures and equipment.
  • Center of excellence in transport electrification and energy storage (CETEES): world-class innovation hub in the field of battery materials for electric vehicles and other energy storage applications, both stationary and mobile.
  • High-voltage laboratory: The biggest high-voltage laboratory of North America where various tests are made for the approval of power transformers and testing of various high-voltage devices

Required Information

Total

Rates are in CAD

Promo Code

Payment

Important Notice:
If you reside outside Canada and you are having difficulties completing your registration, the problem could very well be due to an "International" security issue from your credit card provider.
Please contact them if that is the case.
Thank you.
Credit Card Information
*If you have any issues with your credit card payment, kindly send us an email on info@pro4events.com

Our Sponsors

Premiere Sponsor
Sediver
Host Utility
Hydro-Quebec
Diamond Sponsors
Siemens Canada
Hitachi
Siemens Energy
Platinum Sponsors
PLP Canada
EMTP
TCI+
Gold Sponsors
PSCAD
Shemar
K-Line Insulators Limited
OPAL-RT Technologies
Silver Sponsors
GE Vernova
MIDEL
NIDEC Conversion
Bronze Sponsors
Sieyuan
Hotel Key Cards
Hitachi
Conference Bags
Atelier HR
EVENT APP
RTDS
Hotel Partner
Intercontinental Montreal
Le Westin Montreal
Monville
Lanyards
Hitachi
Next Generation Network (NGN) Sponsor
AtkinsRealis
Women in Energy (WIE) Sponsor
Mitsubishi
Processing...